Your guide to the fast growing energy sector of the Central Asia
Ak Buura Group is one of the leading companies in the construction and design of small hydropower plants in the Kyrgyz Republic
AK BUURA GROUP
Presentation Video
REALIZED PROJECTS
Launched in 2015 (first phase)
Launched in 2016
Launched in 2020
Launched in 2022
Small HPP "Isfayram 1" with the capacity of 2 MW
Launched in 2024
UPCOMING PROJECTS
Small HPP ISFAYRAM 2  
SMALL HPP ISFAYRAM 2
2025 / CAPACITY 4 MW
SMALL HPP ZARDALY
2026 / СAPACITY 29 MW
SMALL HPP TOKTOGUL
2025 / СAPACITY 9.4 MW
CONSTRUCTION PROCESS
Small HPP ISFAYRAM 2  
ENERGY SECTOR OF THE KYRGYZ REPUBLIC
>140 Twh
Total hydropower potential
#3
Largest hydropower potential in CIS
10%
The percentage of utilization of the potential
8
Cascades can be built on the Naryn River
6450 MW
Total installed capacity of of prospective cascades
>25B kwH
Average annual generation of electricity

WHY IS THE KYRGYZ REPUBLIC?
  • Protection of the foreign investments
    1
  • Assistance in implementation of electricity exports in the framework of the project "CASA-1000"
    2
  • Assistance in obtaining the licenses, permits and approvals
    3
  • Equal operating conditions for the foreign and local companies
    4
  • Possibilities of broad cooperation in the framework of PPP
    5
  • Available qualified personnel
    6
  • Guaranteed purchase of electricity by the government at increased tariff for 15 years
    7
  • Full exemption from all taxes after commissioning of hydroelectric power plants
    8
  • Permission for crypto mining operations with a minimal tax of 10% on kW sales
    9
Energy is one of the main directions of my policy, therefore special attention is paid to it.
— the President of the Kyrgyz Republic Sadyr Japarov
WHY WE
  • 15 years of experience in energy sector
  • Partnership with leading manufacturers of turbines and equipment
    for hydroelectric power plants
  • More than 20 projects ready for investment
  • Specialization in the design and construction of small hydropower plants
  • We have a license to sell electricity
OUR PARTNERS
WHAT CLIENTS SAY ABOUT US
"SATELLIT 2005"
Adylbek Mirzamatov, CEO
Due to the professional skills of Duishonbek Muratov "Satellite-2005" company was able to achieve many positive results in the development of small hydropower plants. Currently Duishonbek Muratov has his own company that is actively engaged in design and construction of objects using renewable energy sources, takes part in discussions of draft laws in the sphere of renewable energy sources. We recommend him as a reliable and professional partner in the field of small hydropower plants.
Also Muratov D. made efforts to implement the 800 kW Kyrgyzstan-Ata 2 MGES project. He was personally involved in the design and obtaining permits.
Sanatorium-Preventorium named after
K. Mamakeev
Marita Tulenova, Director
"Ak-Buura Group" LLC represented by director Muratov Duishonbek is our partner in the construction and operation of small HPPs. In 2021 Muratov Duishonbek himself completely built a small HPP of 200 kW capacity for our organization. We recommend "Ak-Buura Group" LLC and especially Muratov Duishonbek as a reliable and stable partner in the construction of small hydropower plants.
OUR CONTACTS
Feel free to write and call us or leave your contact information for us to contact you
+996 550 697-313
m.aitbaev@akbuuragroup.com
6 Konur-Jaz Street, Osh, Kyrgyz Republic
Preferred mode of communication